SGS, ISO, OHSAS
Henan, China (Mainland)
L/C, T/T, Western Union
300 Tons Per Month Steam Boiler
Average 7 Days
PE films for gas steam boiler main body, spare parts packed with PE film and metal boxes
0.4-0.7Mpa
Natural Gas Steam Boiler
100-1000KG/H
152-184℃
ON-OFF Control
Engineers available to service machinery overseas